溪洛渡、向家坝水库与三峡水库联合蓄水调度研究

陈炯宏 傅巧萍 丁毅 黄仁勇

人民长江2016,Vol.47Issue(7):102-105,113,5.
人民长江2016,Vol.47Issue(7):102-105,113,5.DOI:10.16232/j.cnki.1001-4179.2016.07.022

溪洛渡、向家坝水库与三峡水库联合蓄水调度研究

Study of coordinated impoundment scheduling scheme of Xiluodu Reservoir, Xiangjiaba Reservoir and Three Gorges Reservoir

陈炯宏 1傅巧萍 1丁毅 1黄仁勇2

作者信息

  • 1. 长江勘测规划设计研究有限责任公司,湖北 武汉430010
  • 2. 长江科学院 河流研究所,湖北 武汉430010
  • 折叠

摘要

Abstract

The impoundment of Three Gorges Reservoir is more difficult because of the synchronization demand of Xiluodu Reservoir, Xiangjiaba Reservoir and Three Gorges Reservoir impoundment, which would influence the full play of their compre-hensive benefit. To meet the new requirement of the downstream to the discharge of the reservoirs at upstream during the im-poundment period, the reservoir scheduling scheme of Xiluodu Reservoir, Xiangjiaba Reservoir and Three Gorges Reservoir was studied and the water storage condition of the cascade reservoirs was optimized. On the basis of the comprehensive analysis of flood control, reservoir sediment, submerge areas, power generation and water supply, the optimal solution for water storage scheduling scheme was recommended. The analysis of the influence of flood control, impoundment and sedimentation shows that the scheme can relieve the water supply pressure on the downstream areas, which is of practical significance to guiding the joint operation of reservoirs impoundment.

关键词

联合蓄水调度/溪洛渡水库/向家坝水库/三峡水库

Key words

joint operation for reservoir impoundment/Xiluodu Reservoir/Xiangjiaba Reservoir/Three Gorges Reservoir

分类

建筑与水利

引用本文复制引用

陈炯宏,傅巧萍,丁毅,黄仁勇..溪洛渡、向家坝水库与三峡水库联合蓄水调度研究[J].人民长江,2016,47(7):102-105,113,5.

基金项目

三峡水库科学调度关键技术研究“基于水文预报的三峡水库蓄水调度方式研究”(2413020005) (2413020005)

人民长江

OA北大核心

1001-4179

访问量5
|
下载量0
段落导航相关论文