山东煤炭科技Issue(2):10-12,3.DOI:10.3969/j.issn.1005-2801.2016.02.005
复杂条件下掘锚一体机快速成巷技术研究
Bolter Miner Quick Tunneling Technology and Process in Complex Conditions
王中亮 1王振虹 1刘海泉1
作者信息
- 1. 煤炭工业济南设计研究院有限公司,山东济南,250031
- 折叠
摘要
Abstract
This paper used Changcun Coal Mine as engineering background. Designed the roadway optimal support program with bolter miner construction, optimized the cutting operation step of bolter miner. For the problem of roadway roof falling and slabbing in construction, Optimized the construction technology of bolter miner. The ifeld application results showed that coal roadway monthly drilling footage increased from 300m to 600m. The roadway support worked well and the bolter miner adapted to the complex geological conditions of the project site.关键词
掘锚机/支护设计/快速成巷/施工工艺Key words
bolter miner/support design/quick tunneling/construction technology分类
矿业与冶金引用本文复制引用
王中亮,王振虹,刘海泉..复杂条件下掘锚一体机快速成巷技术研究[J].山东煤炭科技,2016,(2):10-12,3.