原子能科学技术2016,Vol.50Issue(3):440-445,6.DOI:10.7538/yzk.2016.50.03.0440
用 MELCOR 程序分析600 MWe 核电厂乏燃料水池失去厂内外电源严重事故
Station Blackout Severe Accident Analysis of Spent Fuel Pool of 600 MWe NPP by Using MELCOR Code
张应超 1季松涛 1魏严凇 1史晓磊 1许倩1
作者信息
- 1. 中国原子能科学研究院 反应堆工程研究设计所,北京 102413
- 折叠
摘要
Abstract
Using MELCOR code ,the spent fuel pool (SFP) of 600 MWe nuclear power plant (NPP) was modeled ,and the station blackout severe accidents were calculated when the SFP was under normal condition ,refuelling condition and the reactor accident condition .The calculation results show that fuel assemblies will melt down and hydro‐gen will generate ,due to zirconium‐water reaction ,after the half height of fuel assem‐blies is uncovered .The influence of injection or spray on SFP accidents was analysed , and the results show that SFP accidents will be terminated and the water level of SFP will return up before fuel cladding damage if water is injected or sprayed into the SFP with the boiling evaporation mass rate .关键词
MELCOR/乏燃料/乏燃料水池/严重事故Key words
M ELCOR/spent fuel/spent fuel pool/severe accident分类
能源科技引用本文复制引用
张应超,季松涛,魏严凇,史晓磊,许倩..用 MELCOR 程序分析600 MWe 核电厂乏燃料水池失去厂内外电源严重事故[J].原子能科学技术,2016,50(3):440-445,6.