工程科学学报2016,Vol.38Issue(4):447-452,6.DOI:10.13374/j.issn2095-9389.2016.04.001
基于SURPAC的残矿开采堑沟巷道空间位置优化
Position optimization of trench tunnels for caving residual orebodies based on SURPAC
摘要
Abstract
Because of the complexity of the residual orebody space form, the traditional cutting drawing method is difficult to show the orebody form intuitively and comprehensively, leading to difficulties in cutting engineering design, while SURPAC uses a 3D mod-eling method to solve this problem. An induced caving method of residual orebodies was investigated with Xishimen Iron Mine as the background. The trench’s ore quantity, metal quantity and grade were calculated by SURPAC. The horizontal and vertical positions of a trench tunnel were taken as the optimization objects, and the trench tunnel in both directions was laid out by analyzing the critical caving span and the field engineering and technical conditions. According to the scope, a scheme of orthogonal test was designed. Taking extraction metal quantity and average grade as the assessment indexes, the range analysis and variance analysis of orthogonal test were conducted to obtain the position of a trench tunnel:double trench tunnels have a separation distance of 24 m, with a horizon-tal level of 118 m. Along with the scene implement, ideal test results have been achieved for refinement caving.关键词
铁矿山/冒落法/堑沟挖掘/优化/回采Key words
iron mines/caving/trench excavation/optimization/stoping分类
矿业与冶金引用本文复制引用
丁航行,任凤玉,刘洋,宋德林,阚景文,李楠..基于SURPAC的残矿开采堑沟巷道空间位置优化[J].工程科学学报,2016,38(4):447-452,6.基金项目
国家自然科学基金资助项目(51404065) (51404065)
“十二五”国家科技支撑计划资助项目(2013BAB02B08) (2013BAB02B08)
中央高校基本科研业务费专项资金资助项目(N140104008) (N140104008)
中国博士后科学基金资助项目(2013M541244) (2013M541244)