引洮二期工程隧洞出碴方案比选

王军

广西水利水电Issue(2):64-66,75,4.
广西水利水电Issue(2):64-66,75,4.

引洮二期工程隧洞出碴方案比选

Comparison and selection of tunnel mucking schemes for Yinzhao 2nd-stage Project

王军1

作者信息

  • 1. 甘肃省水利水电勘测设计研究院,兰州 730030
  • 折叠

摘要

Abstract

Mucking scheme is an important factor affecting the boring efficiency of long tunnel. Taking Yinzhao 2nd-stage Project with tunnel construction as example, the author analyzed the factors affecting the mucking modes combined with the geological and construction conditions; put forward several mucking schemes; and compared these schemes in respects of cost, environmental protection and mucking efficiency before the tunnel mucking scheme was recommended with trackless transport as main method and rail transport as auxiliary one.

关键词

引洮二期工程/隧洞/出碴方案/支洞布置

Key words

Yinzhao 2nd-stage Project/tunnel/mucking scheme/arrangement of branch tunnel

分类

交通工程

引用本文复制引用

王军..引洮二期工程隧洞出碴方案比选[J].广西水利水电,2016,(2):64-66,75,4.

广西水利水电

1003-1510

访问量0
|
下载量0
段落导航相关论文