| 注册
首页|期刊导航|水利水电科技进展|基于改进湿周法的贾鲁河河道内生态需水量计算

基于改进湿周法的贾鲁河河道内生态需水量计算

于鲁冀 陈慧敏 王莉 吕晓燕 范鹏宇

水利水电科技进展2016,Vol.36Issue(3):5-9,94,6.
水利水电科技进展2016,Vol.36Issue(3):5-9,94,6.DOI:10.3880/j.issn.1006-7647.2016.03.002

基于改进湿周法的贾鲁河河道内生态需水量计算

Study of ecological instream flow requirement of Jialu River based on improved wetted perimeter method

于鲁冀 1陈慧敏 2王莉 1吕晓燕 1范鹏宇2

作者信息

  • 1. 郑州大学水利与环境学院,河南 郑州 450001
  • 2. 郑州大学环境政策规划评价研究中心,河南 郑州 450002
  • 折叠

摘要

Abstract

According to the actual conditions along the Jialu River, we selected the Zhongmou and Fugou Hydrological Stations as the control sections, and calculated the ecological instream flow requirements of the Jialu River in different frequency years using three kinds of improved wetted perimeter methods, including the slope method, the curvature method, and the multi-objective evaluation method. The results show that the calculated ecological flow requirement is greatest when using the multi-objective evaluation method (r=2), and least when using the curvature method. It is more reasonable to use the multi-objective evaluation method (r=2) to calculate the ecological flow requirement of the Zhongmou section, and to use the slope method to calculate the ecological water requirement of the Fugou section.

关键词

生态需水量/湿周法/斜率法/曲率法/多目标评价法/贾鲁河

Key words

ecological flow requirement/wetted perimeter method/slope method/curvature method/multi-objective evaluation method/Jialu River

分类

资源环境

引用本文复制引用

于鲁冀,陈慧敏,王莉,吕晓燕,范鹏宇..基于改进湿周法的贾鲁河河道内生态需水量计算[J].水利水电科技进展,2016,36(3):5-9,94,6.

基金项目

“十二五”国家水体污染控制与治理重大专项(2012ZX07204-004-001) (2012ZX07204-004-001)

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量0
|
下载量0
段落导航相关论文