| 注册
首页|期刊导航|铁道标准设计|顶推钢导梁与主梁新型连接方式研究

顶推钢导梁与主梁新型连接方式研究

张威振 杨素娟

铁道标准设计2016,Vol.60Issue(5):37-41,5.
铁道标准设计2016,Vol.60Issue(5):37-41,5.DOI:10.13238/j.issn.1004-2954.2016.05.009

顶推钢导梁与主梁新型连接方式研究

Research on New Type of Connection between Launching Nose and Main Girder

张威振 1杨素娟2

作者信息

  • 1. 湖南中大设计院有限公司,长沙 410075
  • 2. 湖南高速铁路职业技术学院,湖南衡阳 421002
  • 折叠

摘要

Abstract

The screw-thread steel bar is often used for the connection between launching nose and main girder in typical incremental launching process. Because the thickness of the web plate is thin and the launching nose is not matched with the height of the girder, it is difficult to meet the needs of incremental launching construction by using conventional screw-thread steel bar connection method. To solve this problem, this paper presents a new method of connection by combining shear force distribution beam with horizontal screw-thread steel bars. The practice proves that the connection is simple and applicable. The successful application provides good and meaningful references for the launching nose connection of other similar flyovers ( crossing over railway and highway) .

关键词

铁路桥梁/精轧螺纹钢/剪力分配梁/顶推施工/导梁连接

Key words

Railway bridge/Screw-thread steel bar/Shear force distribution beam/Incremental launching/Launching nose connection

分类

交通工程

引用本文复制引用

张威振,杨素娟..顶推钢导梁与主梁新型连接方式研究[J].铁道标准设计,2016,60(5):37-41,5.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文