铁道标准设计2016,Vol.60Issue(5):59-63,64,6.DOI:10.13238/j.issn.1004-2954.2016.05.013
城市快速通道跨越铁路大型编组站桥梁方案比选研究
Comparison and Research of Urban Expressway Bridge Crossing Over Large Railway Marshalling Yard
周继 1张晓江 1田芳1
作者信息
- 1. 中铁第四勘察设计院集团有限公司,武汉 430063
- 折叠
摘要
Abstract
Nongye road expressway project crosses over the north marshalling yard of more than 30 tracks and Beijing-Guangzhou railway in Zhengzhou, and the existing road under the bridge passes through under the Zhengzhou north marshalling yard. There are many frame bridges and road bridges at the work site and the number of feasible pier location for the bridge is very few, which challenges the construction of the bridge. Thus, it is absolutely necessary to study and choose a reasonable bridge type for the project. The researches on some feasible pier locations and the selection of feasible construction program and span arrangement result in the determination of 4 bridge types, and one reasonable bridge type is recommended after analysis and comparison in terms of railway safety, technology, schedule and economy. The results show that the ( 126+200+126 ) m twin tower cable-stayed bridge is the recommended bridge type. The research process and method employed may provide references for the design of similar projects.关键词
铁路编组站/斜拉桥/桥梁方案/可行性墩位/施工方案Key words
Railway marshalling yard/Cable-stayed bridge:Bridge type/Feasible pier location/Construction program分类
交通工程引用本文复制引用
周继,张晓江,田芳..城市快速通道跨越铁路大型编组站桥梁方案比选研究[J].铁道标准设计,2016,60(5):59-63,64,6.