摘要

Abstract

Bibanpo extra-long tunnel is the longest tunnel on Shanghai-Kunming high-speed railway. The tunnel body is cut by three by faults with broken surrounding rock, rich groundwater and complex engineering geological conditions. An advanced geological prediction system is established in perspective of short-term forecasting and medium and long-term forecasting for such a tunnel. The system uses TSP for long range forecasting, infrared exploring meter for short range and geological drilling to accurately detect the location of water-rich broken zone and the degree of water content, providing an important basis for construction plan and tunnel safety and verifying the effectiveness of the system in engineering application.

关键词

铁路隧道/超前地质预报/富水逆断层/岩溶/综合预报技术

Key words

Railway tunnel/Advanced geological prediction/Water-rich reverse fault/Karst/synthetic prediction technique