| 注册
首页|期刊导航|国际设备工程与管理(英文版)|LS-SVR and AGO Based Time Series Prediction Method

LS-SVR and AGO Based Time Series Prediction Method

ZHANG Shou-peng LIU Shan CHAI Wang-xu ZHANG Jia-qi GUO Yang-ming

国际设备工程与管理(英文版)2016,Vol.21Issue(1):1-13,13.
国际设备工程与管理(英文版)2016,Vol.21Issue(1):1-13,13.DOI:10.13434/j.cnki.1007-4546.2016.0101

LS-SVR and AGO Based Time Series Prediction Method

LS-SVR and AGO Based Time Series Prediction Method

ZHANG Shou-peng 1LIU Shan 2CHAI Wang-xu 2ZHANG Jia-qi 2GUO Yang-ming2

作者信息

  • 1. Aeronautical Computing Technique Research Institute, Aviation Industry Corporation of China, Xi′an 710068, P.R.China
  • 2. School of Computer Science and Technology, Northwestern Polytechnical University, Xi′an 710072, P.R.China
  • 折叠

摘要

关键词

time series prediction/least squares support vector regression ( LS-SVR )/Gaussian radial basis function ( RBF)/accumulated generating operation ( AGO)

Key words

time series prediction/least squares support vector regression ( LS-SVR )/Gaussian radial basis function ( RBF)/accumulated generating operation ( AGO)

引用本文复制引用

ZHANG Shou-peng,LIU Shan,CHAI Wang-xu,ZHANG Jia-qi,GUO Yang-ming..LS-SVR and AGO Based Time Series Prediction Method[J].国际设备工程与管理(英文版),2016,21(1):1-13,13.

基金项目

This work is supported by National Natural Science Foundation ( NNSF ) of China under Grant No .61371024, Aviation Science Fund of China under Grant No .2013ZD53051, Aerospace Technology Support Fund of China , the Industry-Academy-Research Project of AVIC (cxy2013XGD14). ()

国际设备工程与管理(英文版)

1007-4546

访问量0
|
下载量0
段落导航相关论文