| 注册
首页|期刊导航|西北水电|高压引水隧洞衬砌配筋简化算法

高压引水隧洞衬砌配筋简化算法

张帆 詹振彪 屈洁

西北水电Issue(2):33-37,5.
西北水电Issue(2):33-37,5.DOI:10.3969/j.issn.1006-2610.2016.02.010

高压引水隧洞衬砌配筋简化算法

Simplified Calculation of Reinforcement Arrangement for Lining of High-pressure Headrace Tunnel

张帆 1詹振彪 1屈洁1

作者信息

  • 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
  • 折叠

摘要

Abstract

The elastic mechanics method in foreign specification is applied for design of the lining structure of headrace tunnel.Partial exter-nal hydraulic pressure is considered, but the lining is still designed based on impermeability and calculation is performed by surface force theory.Those result in arrangement of reinforcement in a high quantity.In practice, the lining is already cracked by action of the high inter-nal hydraulic pressure.In operation period, the internal water seeps outward.In repair period, the external water seeps inside the tunnel a-long cracks.Therefore, application of the surface force theory cannot explain the interaction of internal and external water.It is difficult to simulate the stable seepage fields in tunnel and surrounding-rock media.In this paper, the design method with consideration of cracks is ap-plied.Considering the seepage action, the simplified method of the nonlinear calculation applicable for design of lining of the high-head hy-dropower project is proposed.

关键词

弹性力学/钢筋混凝土衬砌/渗流场/非线性计算

Key words

elastic mechanics/reinforced concrete lining/seepage field/nonlinear calculation

分类

建筑与水利

引用本文复制引用

张帆,詹振彪,屈洁..高压引水隧洞衬砌配筋简化算法[J].西北水电,2016,(2):33-37,5.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文