云南水力发电2016,Vol.32Issue(2):1-4,4.DOI:10.3969/j.issn.1006-3951.2016.02.001
模糊综合评价法在水库移民安置评估实践中的应用
Application of the Fuzzy Comprehensive Evaluation Method to Assessment Practice of Land Acquisition and Resettlement for Construction of A Reservoir
王煜1
作者信息
- 1. 中国电建集团昆明勘测设计研究院有限公司水库工程分院,云南 昆明 650051
- 折叠
摘要
Abstract
The land acquisition and resettlement work for construction of a reservoir is a complex social systems engineering project involving many areas, many departments and many participants. The objective evaluation of implementation of the resettlement and its corresponding policies can provide scientifi c basis for guiding and carrying out the next stage work. At present the evaluation is mainly conducted based on the informal discussions of various participants concerned and qualitative description without quantitative analysis, in which the comments offered and conclusions made are often in general terms and don’t go into details. The application of the fuzzy comprehensive evaluation method is able to quantify the conformity of the evaluation indexes, thus improving practical accuracy and reliability of the evaluation. The method was used to perform case analysis of the independent evaluation of the land acquisition and resettlement for construction of Yunpeng hydropower project, and then its conformity was obtained to put forward proper measures for the next stage work.关键词
移民安置/评估/实践应用/模糊综合评价法Key words
resettlement/evaluation/practical application/fuzzy comprehensive evaluation method分类
社会科学引用本文复制引用
王煜..模糊综合评价法在水库移民安置评估实践中的应用[J].云南水力发电,2016,32(2):1-4,4.