摘要

Abstract

More and more wide application of distributed generation (DG)technology in power system brings certain impact and influence on power distribution network planning. Therefore,uncertain programming theory is used for fuzzy simulation on output power of wind power generation and photovoltaic generation and uncertainty of load in power distribution net-work,and an optimization model for power distribution network structure based on this theory is established as well. Mean-while,improved partheno-genetic algorithm based on tree structure coding is used for solving the model. Finally,simulating analysis on 16-node system example verifies feasibility of the planning model based on uncertain programming theory and va-lidity of the improved partheno-genetic algorithm.

关键词

分布式电源/配电网规划/不确定规划/模糊模拟/树形结构编码/改进单亲遗传算法

Key words

distributed generation (DG)/power distribution network planning/uncertain programming/fuzzy simulation/tree structure coding/improved partheno-genetic algorithm