| 注册
首页|期刊导航|江苏水利|长江南京龙潭段华能金陵电厂水下地形勘测工程技术分析

长江南京龙潭段华能金陵电厂水下地形勘测工程技术分析

武雁刚 范睿 王义坤 王苏

江苏水利Issue(6):66-68,3.
江苏水利Issue(6):66-68,3.

长江南京龙潭段华能金陵电厂水下地形勘测工程技术分析

Analysis of underwater topographic survey engineering technology of Huaneng Jinling power plant in Yangtze River Nanjing section of Longtan

武雁刚 1范睿 1王义坤 1王苏1

作者信息

  • 1. 南京市长江河道管理处,江苏 南京 210000
  • 折叠

摘要

Abstract

Huaneng Jinling power plant is located in Qixia district of Nanjing. In order to ensure the safety during the operation of Huaneng Jinling power plant Phase II terminal,analyze the underwater topographic development,underwater topographic survey of 1:1000 for Huaneng Jinling power plant Phase II terminal is carried out by survey team of Nanjing Yangtze River Management Division. References for future measurement are provided by analyzing the underwater survey technology and summarizing the experience.

关键词

水下地形/长江/勘察/水下勘测/借鉴/南京市

Key words

underwater topography/the Yangtze River/survey/underwater survey/reference/Nanjing City

分类

建筑与水利

引用本文复制引用

武雁刚,范睿,王义坤,王苏..长江南京龙潭段华能金陵电厂水下地形勘测工程技术分析[J].江苏水利,2016,(6):66-68,3.

江苏水利

1007-7839

访问量0
|
下载量0
段落导航相关论文