软土地层超大盾构穿越运营地铁隧道的变形控制技术研究

周隽

上海国土资源2016,Vol.37Issue(2):57-60,4.
上海国土资源2016,Vol.37Issue(2):57-60,4.DOI:10.3969/j.issn.2095-1329.2016.02.014

软土地层超大盾构穿越运营地铁隧道的变形控制技术研究

Deformation control technology for an extra-large EPB shield machine crossing an operational subway tunnel in soft ground

周隽1

作者信息

  • 1. 上海隧道工程股份有限公司,上海200232
  • 折叠

摘要

Abstract

The control technology for a 14.27 m earth pressure balance (EPB) shield machine crossing above an operational subway tunnel is studied. A numerical simulation method is employed to analyze the range of inlfuence and the degree of shielding with different loads on the operational subway tunnel below. A control for the deformation induced by the shielding that integrates the shielding parameter control with loading in the tunnel is proposed. The Bund Tunnel project that crosses operational Subway Line 2 veriifed the feasibility of the control technology. This provides a useful reference for subsequent engineering and assists in developing control practices for land subsidence related to engineering construction projects.

关键词

软土地层/土压平衡盾构/地铁隧道/变形控制/工程建设/地面沉降

Key words

soft ground/earth pressure balance (EPB) shield/subway tunnel/deformation controlling/engineering construction/land subsidence