铁道标准设计2016,Vol.60Issue(6):18-22,5.DOI:10.13238/j.issn.1004-2954.2016.06.005
柳肇铁路引入广州枢纽后方通路方案研究
Schematic Study on Rear Access Scheme of Liuzhou-Zhaoqing Railway Leading into Guangzhou Railway Terminal
摘要
Abstract
Newly-built railways are coming increasingly into service and many existing hubs are receiving new lines, which expands hub capacity and, at the same time, imposes certain impacts on hub layout. With reference to Liuzhou-Zhaoqing railway access to Guangzhou regional hub and in view of the project functional orientation, hub channel capacity adaptability and urban development planning, this paper addresses the factors to be considered related the access. The applicable program is selected technologically and economically in terms of the access length, transport organization, engineering investment and implementation difficulties.关键词
柳肇铁路/广州枢纽/后方通路/方案研究Key words
Liuzhou-Zhaoqing Railway/Guangzhou Railway Terminal/Rear access/Schematic study分类
交通工程引用本文复制引用
熊礼毅..柳肇铁路引入广州枢纽后方通路方案研究[J].铁道标准设计,2016,60(6):18-22,5.