| 注册
首页|期刊导航|铁道标准设计|大跨度钢桁梁桥静动力性能试验研究

大跨度钢桁梁桥静动力性能试验研究

陈树礼 刘永前 张彦兵

铁道标准设计2016,Vol.60Issue(6):38-42,5.
铁道标准设计2016,Vol.60Issue(6):38-42,5.DOI:10.13238/j.issn.1004-2954.2016.06.009

大跨度钢桁梁桥静动力性能试验研究

Test Research on Static and Dynamic Performances of Large Span Steel Truss Girder Bridge

陈树礼 1刘永前 1张彦兵1

作者信息

  • 1. 石家庄铁道大学大型结构健康诊断与控制研究所,石家庄 050043
  • 折叠

摘要

Abstract

Taking the 64 m through steel truss bridge as the research object, the test research on bridge static and dynamic performances is completed with numerical analysis and field test. The results show that under static load the measured stress and deflection of the bridge are less than the theoretical calculation, the deflection and the stress check coefficient are slightly larger than the standard normal values, the relative residual of deflection and stress meet the standard requirement, and the stresses of the two main trusses are in balance. The operating performance indicators under trains of different speed can basically meet the standard requirements, but the measurements are larger than that of similar double wire steel truss bridge. The empty and weight mixed trains cause greater vibration. Overall, the bearing capacity and service condition of the bridge basically meet the standard requirements and in good elastic working condition, but the bridge structure overall rigidity is weak with small emergency capacity. Thus, it is recommended that the entire bridge stiffness should be strengthened and the real-time bridge dynamic response monitored.

关键词

大跨度/下承式钢桁梁桥/静动力性能/试验/数值分析/承载能力

Key words

Large span/Through steel truss girder bridge/Static and dynamic performance/Test/Numerical analysis/Bearing capacity

分类

交通工程

引用本文复制引用

陈树礼,刘永前,张彦兵..大跨度钢桁梁桥静动力性能试验研究[J].铁道标准设计,2016,60(6):38-42,5.

基金项目

国家高技术研究发展计划(863计划)(2009AA11Z102),铁道部科技研究开发计划(重大课题)(2012G011-A) (863计划)

铁道标准设计

OA北大核心

1004-2954

访问量3
|
下载量0
段落导航相关论文