| 注册
首页|期刊导航|铁道标准设计|时速160 km以下双层集装箱运输铁路有砟轨道隧道内轮廓研究

时速160 km以下双层集装箱运输铁路有砟轨道隧道内轮廓研究

韩现民 陈时玉 马涛

铁道标准设计2016,Vol.60Issue(6):71-74,75,5.
铁道标准设计2016,Vol.60Issue(6):71-74,75,5.DOI:10.13238/j.issn.1004-2954.2016.06.015

时速160 km以下双层集装箱运输铁路有砟轨道隧道内轮廓研究

Research on Inner Contour of Ballast Track Railway Tunnel for Double-deck Container Transport at Speed below 160 km/h

韩现民 1陈时玉 1马涛2

作者信息

  • 1. 石家庄铁道大学土木工程学院,石家庄 050043
  • 2. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

At present, the inner contour of ballasted track ( double-deck container transport ) railway tunnel with speed below 160 km/h could hardly meet the requirements for maintenance by heavy machinery ( especially large railway ballast cleaning machine ) . In this paper, the main factors that influence inner contour of railway tunnel, such as building limit, overhead catenary system and layout, space requirement for heavy machinery, track structure, arrangement of ditch and cable trench are comprehensively analyzed to determine the controlling dimensions of single and double track railway tunnel and some alternative schemes are proposed. By comparison of structure safety, economical efficiency and construction feasibilities related to each type of the inner contour schemes, reasonable schemes are recommended, which may pay the way for general drawings and specifications.

关键词

时速160km以下铁路/铁路隧道/双层集装箱运输/大机养护/隧道内轮廓

Key words

Railway of 160 km/h and bellow/Railway tunnel/Double-deck container transport/Heavy maintenance machinery/Inner contour of tunnel

分类

交通工程

引用本文复制引用

韩现民,陈时玉,马涛..时速160 km以下双层集装箱运输铁路有砟轨道隧道内轮廓研究[J].铁道标准设计,2016,60(6):71-74,75,5.

基金项目

中国铁路总公司科技研发计划(J2014C007) (J2014C007)

河北省自然科学基金(E2013210119) (E2013210119)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文