| 注册
首页|期刊导航|铁道标准设计|西宝高速铁路大型临时工程设计回顾

西宝高速铁路大型临时工程设计回顾

高娟

铁道标准设计2016,Vol.60Issue(7):51-54,4.
铁道标准设计2016,Vol.60Issue(7):51-54,4.DOI:10.13238/j.issn.1004-2954.2016.07.012

西宝高速铁路大型临时工程设计回顾

Review of the Design of Large-scale Temporary Works of Xi’an-Baoji High Speed Railway

高娟1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安 710043
  • 折叠

摘要

Abstract

Xi’an-Baoji high speed railway is one of the first high speed railway design projects, which addresses the design of large-scale temporary works according to the requirements of the former ministry of railways. Based on the engineering features of Xi-Bao high speed railway project and the design requirements of large-scale temporary works, this article reviews the practices in the design of large-scale temporary works of Xi-Bao high speed railway project, and analyses the setting principles and the layout involved. In addition, design schemes are compared with site practices to reach for the gains and losses in the design. Finally, the general setting principle and layout to design large-scale temporary works of high speed railway projects are worked out to guide future design of similar projects.

关键词

高速铁路/大临工程/设计/回顾

Key words

High speed railway/Large-scale temporary works/Design/Review

分类

交通工程

引用本文复制引用

高娟..西宝高速铁路大型临时工程设计回顾[J].铁道标准设计,2016,60(7):51-54,4.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文