广东电力2016,Vol.29Issue(6):12-17,6.DOI:10.3969/j.issn.1007-290X.2016.06.003
600MW电站锅炉SCR脱硝系统全负荷投运改造方案研究与工程实践
Research on Transformation Scheme for Full-load Operation of SCR Denitration System of 600 MW Substation Boiler and Engineering Practice
摘要
Abstract
In allusion to the status quo of selective catalytic reduction (SCR) denitration system being unable to be in opera‐tion with low load in one 600 MW coal‐fired power plant ,this paper introduces three transformation schemes for full‐load operation of the SCR system .Thermodynamic calculation for the boiler and comparison of schemes indicates that the opti‐mal scheme is to use economizer classification and then field transformation is finished .In two aspects of entrance fuel gas temperature of SCR and boiler efficiency ,it analyzes effects after transformation which indicates preferable engineering effects of classification transformation of the economizer .关键词
SC R脱硝系统/全负荷投运/省煤器分级改造Key words
SCR denitration system/full-load operation/classification transformation of economizer分类
资源环境引用本文复制引用
李德波,曾庭华,廖永进,余岳溪,李方勇..600MW电站锅炉SCR脱硝系统全负荷投运改造方案研究与工程实践[J].广东电力,2016,29(6):12-17,6.基金项目
国家自然科学基金重点项目 ()