摘要

Abstract

Considering viaduct pier and traction network’selectrical coupling, this paper focuses on the study of electromagnetic transient effect for electricmultipleunit (EMU) passingsplit-phase insulator, whichhas important significant to the operation safety of EMU, sincethetraction lines of HSR (high-speed railway) power traction system are mostly laid on viaduct. Firstly, equivalent circuit model including traction power supply circuit andviaduct pier loop circuit is established. Secondly, this paper analyzes and solves the coupling coefficient of viaduct pier and various electrical parameters. Thirdly,the vehicle-catenary-viaduct couplinglumped parameter model regarding each transient process for EMU passing split-phase insulator is built by ATP-EMTP. Finally,thecorresponding electromagnetic transient processes, which respectively consider viaduct or not, are simulated, and their influencing factors are analyzedindetail. The simulation results indicate that the viaduct looped circuit provides with effective discharge channel to weaken the over-voltage amplitude obviously.

关键词

高速铁路/高架桥/自动过分相/ATP-EMTP/过电压

Key words

high-speed railway/viaduct/automatic phase separation/ATP-EMTP/over-voltage

引用本文复制引用

宋小翠,刘志刚,王英..基于ATP-EMTP的计及高架桥高速铁路过分相电磁暂态研究[J].电力系统保护与控制,2016,44(13):6-13,8.

基金项目

国家自然科学基金高铁联合基金重点项目(U1434203,U1134205);国家自然科学基金(51377136) (U1434203,U1134205)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量0
|
下载量0
段落导航相关论文