岩土力学2016,Vol.37Issue(5):1388-1398,11.DOI:10.16285/j.rsm.2016.05.022
基于蓄水期反演的锦屏一级拱坝极限承载力分析
Research on ultimate bearing capacity of Jinping-I Arch Dam based on impoundment period inversion
摘要
关键词
锦屏一级/极限承载力/参数反演/工程类比/不平衡力Key words
Jinping-Ⅰ/ultimate bearing capacity/parameter inversion/project analogy/unbalanced force分类
建筑与水利引用本文复制引用
程立,刘耀儒,潘元炜,杨强,周钟,薛利军..基于蓄水期反演的锦屏一级拱坝极限承载力分析[J].岩土力学,2016,37(5):1388-1398,11.基金项目
国家自然科学基金面上项目(No.51479097,No.11172150) (No.51479097,No.11172150)
水沙科学与水利水电工程国家重点实验室科研项目资助(No.2016-KY-02).This work was supported by the General Program of National Natural Science Foundation of China(51479097,11172150) and Research Project of State Key Laboratory of Hydroscience and Hydraulic Engineering (2016-KY-02). (No.2016-KY-02)