| 注册
首页|期刊导航|石油钻采工艺|塔里木山前井涡轮配合孕镶金刚石钻头钻井提速技术

塔里木山前井涡轮配合孕镶金刚石钻头钻井提速技术

王树超 王维韬 雨松

石油钻采工艺2016,Vol.38Issue(2):156-159,4.
石油钻采工艺2016,Vol.38Issue(2):156-159,4.DOI:10.13639/j.odpt.2016.02.005

塔里木山前井涡轮配合孕镶金刚石钻头钻井提速技术

Combination of turbodrill and impregnated diamond bit to enhance ROP in drilling of wells in piedmont zone, Tarim Basin

王树超 1王维韬 2雨松1

作者信息

  • 1. 渤海钻探工程有限公司塔里木钻井分公司
  • 2. 重庆科技学院石油与天然气工程学院
  • 折叠

摘要

Abstract

Piedmont zone in the Tarim Basin is one of key zones for hydrocarbon exploration and development in the Tarim Oilfield. With consideration to high abrasiveness and high drillability of the piedmont zone, low footage per bit, significant bit consumption, low ROP, high drilling costs and other challenges, the combination of turbodrill and impregnated diamond bit was introduced. It was used in 2 wells (well Bozi-102 and well Keshen-2-1-14) drilled in the piedmont zone. According to the drilling data, in Well Bozi-102, the combined assembly achieved a total footage of 704 m, with drilling time of 407.5 h and average ROP of 1.73 m/h, and in Well Keshen-2-1-14, the combined assembly achieved a total footage of 146.8 m, with drilling time of 71.75 h and average ROP of 2.05 m/h. Compared with PDC bits and roller bits deployed in identical formation in neighboring wells, the proposed assembly can enhance ROP by 2-4 times, average footage per bit by 3-10 times, and average drilling time by 1.7-2.5 times. Relevant test results show that the combination of turbodrill and impregnated diamond bit can effectively enhance ROP in drilling of wells in piedmont zone, the Tarim Basin, as a powerful technical support.

关键词

塔里木山前构造/深井提速/涡轮钻具/孕镶金刚石钻头/破岩工具

Key words

piedmont structure of Tarim/ROP enhancement in deep well/turbodrill/impregnated diamond bit/rock-breaking tool

分类

能源科技

引用本文复制引用

王树超,王维韬,雨松..塔里木山前井涡轮配合孕镶金刚石钻头钻井提速技术[J].石油钻采工艺,2016,38(2):156-159,4.

石油钻采工艺

OA北大核心CSCDCSTPCD

1000-7393

访问量5
|
下载量0
段落导航相关论文