| 注册
首页|期刊导航|港工技术|新型钢管桩桩尖在天津港高桩码头的应用

新型钢管桩桩尖在天津港高桩码头的应用

刘艳亭 赵娟

港工技术Issue(3):20-22,3.
港工技术Issue(3):20-22,3.

新型钢管桩桩尖在天津港高桩码头的应用

Application of New-type Pile Tip of Steel Pipe Pile to High-pile Wharf in Tianjin Port

刘艳亭 1赵娟1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津,300222
  • 折叠

摘要

Abstract

Based on one piled wharf project at Tianjin Port, the penetration power are compared and analyzed for the steel pipe pile with different types of pile tip. According to the data on static-load trial pile, the plugging effect of semi-closed pile tip and the bearing capacity are also researched for the steel pipe pile driven to different depths. The trial pile results show that the application of steel pipe pile foundation with new-type pile tip to the piled wharf could reduce the length of pile, lower the investment, decrease the blow count for single pile and shorten the construction period effectively,which will provide references for the application of pile tip of steel pipe pile in the future.

关键词

天津港/钢管桩/桩尖/承载能力/闭塞效应

Key words

Tianjin Port/steel pipe pile/tip of pile/bearing capacity/plugging effect

分类

交通工程

引用本文复制引用

刘艳亭,赵娟..新型钢管桩桩尖在天津港高桩码头的应用[J].港工技术,2013,(3):20-22,3.

港工技术

1004-9592

访问量0
|
下载量0
段落导航相关论文