电力系统保护与控制Issue(19):12-16,5.
“三北”地区电网有偿调峰服务费用计算
Peaking cost calculation of“The Three Norths”regional power grid
摘要
Abstract
According to the fact that“The Three Norths"regional power grid contains a large proportion of thermoelectric units, and the peaking task is mainly assumed by condensing units, a peaking cost calculation method is proposed. An optimal dispatching model is built up based on the modeling of the condensing units and thermoelectric units. In this model, power load will be balanced by units in whole network, while heat load will be balanced on the spot by each thermal power plant. By solving the power outputs of all units in two different modes, the peak-regulating capacity of all units can be analyzed. Peaking cost is defined as the difference of power profit among depth peaking intervals of non thermoelectric units. The reasonableness of the calculation method is shown by an example.关键词
“三北”地区电网/有偿调峰费用/热电机组/纯凝机组/调度模型Key words
“The Three Norths”regional power grid/peaking cost/thermoelectric unit/condensing power plant/dispatching model分类
信息技术与安全科学引用本文复制引用
胡佳,胡林献..“三北”地区电网有偿调峰服务费用计算[J].电力系统保护与控制,2013,(19):12-16,5.基金项目
国家高技术研究发展计划(863计划)资助项目(2011AA05A105)@@@@This work is supported by National High-tech R&D Program of China (863 Program)(No.2011AA05A105) (863 Program)