计算机应用研究2014,Vol.31Issue(4):1005-1008,4.DOI:10.3969/j.issn.1001-3695.2014.04.011
生物地理学算法求解柔性作业车间调度问题
Solving flexible Job-Shop scheduling problem based on biogeography-based optimization algorithm
摘要
Abstract
For the flexible Job-Shop scheduling problem (FJSP), this paper proposed the improved biogeography-based optimization algorithm (BBO), modified the migration operator and mutation operator. In the initial stage of the algorithm, it adopted hybrid initiali关键词
生物地理学优化算法/柔性作业车间调度问题/智能优化算法/迁移操作Key words
biogeography-based optimization(BBO) algorithm/flexible Job-Shop scheduling problem(FJSP)/intelligence optimization algorithm/migration operator分类
信息技术与安全科学引用本文复制引用
ZHANG Guo-hui,NIE Li,MAO Xue-gang..生物地理学算法求解柔性作业车间调度问题[J].计算机应用研究,2014,31(4):1005-1008,4.基金项目
国家自然科学基金资助项目(61203179) (61203179)
国家教育部人文社会科学研究青年基金资助项目(12YJC630285) (12YJC630285)