| 注册
首页|期刊导航|电力系统自动化|商业用户电能采暖替代技术选型的边界条件论证

商业用户电能采暖替代技术选型的边界条件论证

曲子清 辛洁晴 吴亮 郑思源

电力系统自动化2016,Vol.40Issue(13):48-54,7.
电力系统自动化2016,Vol.40Issue(13):48-54,7.DOI:10.7500/AEPS20150814001

商业用户电能采暖替代技术选型的边界条件论证

Argument on Boundary Conditions of Selection Electric Energy Substitution Technologies with Electric Heating for Commercial Customers

曲子清 1辛洁晴 1吴亮 2郑思源3

作者信息

  • 1. 电力传输与功率变换控制教育部重点实验室 上海交通大学,上海市200240
  • 2. 国网天津市电力公司电力科学研究院,天津市300384
  • 3. 天津电力节能服务有限公司,天津市300384
  • 折叠

摘要

Abstract

The main form of electric energy substitution for commercial customers is to replace the traditional coal‐fired boilers with the electric ones . There are two primary options for electric heating . One is to install a system including a water chilling unit (WCU) for cooling in summer and a heat storage electric boiler ( HSEB) for heating in winter . The other one is to install a system including a sole ground source heat pump ( GSHP) for both cooling and heating purposes . In order to figure out the boundary conditions of the feasibility of these two different systems , an optimization model with the objective of minimizing the cost difference between these two systems is further proposed to directly solve the boundary conditions , based on the cost functions and operational constraints . Case studies and perturbation analysis are applied towards the comprehensive office buildings in Tianjin . The results show that the feasibility boundary conditions of electric heating technologies include the ratio of maximum summer cooling load and maximum winter heating load and the utilization hours for specific customers in a specific area . The HSEB + WCU system is more economic for areas with large peak‐to‐valley price ratios or with large diurnal temperature differences , while for those with high demand charges or those with no hot water supply but whole‐day heating/cooling demand , the GSHP system is more preponderant .

关键词

商业用户/电能替代/电采暖/制冷/技术选型/边界条件

Key words

commercial customers/electric energy substitution/electric heating/cooling/technology selection/boundary conditions

引用本文复制引用

曲子清,辛洁晴,吴亮,郑思源..商业用户电能采暖替代技术选型的边界条件论证[J].电力系统自动化,2016,40(13):48-54,7.

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文