计算机工程与应用2016,Vol.52Issue(13):228-231,247,5.DOI:10.3778/j.issn.1002-8331.1408-0103
基于结构元矿山产能分配模糊线性规划模型
Model of fuzzy linear programming in capacity allocation of mine based on fuzzy structured element
摘要
Abstract
For mine capacity allocation, the fuzzy conditions about minerals are considered, i.e., the fuzzy profits, the fuzzy resources needed, the fuzzy resources to provide production. Considering the characteristics of fuzzy mathematics and fuzzy linear programming, the predicting model of fuzzy linear programming based on fuzzy structured element is constructed for mine production allocation. Fuzzy structured element theory is used to analyze fuzzy numbers by triangular fuzzy numbers, and obtain the membership functions, and then the structured element weighting order is used to transform the model into the linear programming model. Fuzzy conditions are analyzed exactly in actual problems, the constraints are less, and the resolution is simplified, the fuzzy allocation is obtained with most fuzzy profit, more abundant informa-tion for managerial decision is provided.关键词
产能分配/模糊线性规划/模糊结构元/隶属函数/序Key words
capacity allocation/fuzzy linear programming/fuzzy structured element/subordinate function/order分类
信息技术与安全科学引用本文复制引用
邵良杉,赵琳琳,张艳菊..基于结构元矿山产能分配模糊线性规划模型[J].计算机工程与应用,2016,52(13):228-231,247,5.基金项目
国家自然科学基金(No.71371091) (No.71371091)
辽宁省高等学校杰出青年学者成长计划(No.LJQ2012027). (No.LJQ2012027)