可再生能源2016,Vol.34Issue(6):889-893,5.
贵州山地风力发电机防雷接地技术研究
Study of earthing technology of wind turbine generator in Guizhou mountain area
摘要
Abstract
Wind power construction in Guizhou province is in a rapidly growth stage.Influenced by mountain climate characteristics,the lightning activity in Guizhou province is complex and vulnerable.Because the wind turbine is mainly built on the high terrain ridge,so it is easily to be struck by lighting.In view of the special topography and geological conditions in Guizhou,the article analyzed the methods of earthing technology for wind turbines in Guizhou mountain area.At the same time,the article also discussed the wind turbine erathing problems in Guizhou high soil resistivity areas.Combined with the construction technology of the wind power system,the article puts forward the effective measures to reduce the grounding resistance of wind power generator,and provides reference for the grounding engineering design of wind power generator.关键词
山地风电场/接地电阻/高土壤电阻率/接地技术/环形接地网Key words
mountain wind farm/grounding resistance/high soil resistivity/earthing technology/ring grounding grid分类
信息技术与安全科学引用本文复制引用
曾勇,吴仕军,刘波,吴安坤,张淑霞,刘芸..贵州山地风力发电机防雷接地技术研究[J].可再生能源,2016,34(6):889-893,5.基金项目
贵州省气象局开放基金项目(QNKF[2015]14). (QNKF[2015]14)