From the combination of the finite software of ABAQUS and strength reduction method,making full use of powerful post-processing ability of ABAQUS,this study analyzes a uranium tailings dam stability.The displacement mutation of slope feature control points and plastic zone breakthrough of slipping plane from the dam slope toe to top are used as a sym-bol of the whole slope instability.When plastic zone in the slope sliding surface is connected from the slope toe to top, plastic strain and displacement of characteristic control points result in mutation,the dam slope is in a critical state of sliding failure,while the strength re-duction factor is defined as the minimum safety coefficient of dam slope stability.Through an example of a uranium tailings dam stability analysis, it can predict accurately and vividly dam slope potential sliding surface position and evaluate the stability of dam slop,especially for the stability analysis of complex terrain slope,which is a simple and practicable method.

关键词

ABAQUS软件/强度折减法/特征控制点/安全系数/坝坡

Key words

ABAQUS software/strength reduction method/feature control points/safety co-efficient/dam slope

分类

建筑与水利

引用本文复制引用

周薛淼,刘永,李国辉,卢继鹰..基于ABAQUS强度折减法某铀尾矿坝稳定性分析[J].南华大学学报(自然科学版),2016,30(2):21-26,6.

基金项目

环保部科研基金资助项目(监管1409;1509) (监管1409;1509)

南华大学学报(自然科学版)

1673-0062

访问量1
|
下载量0
段落导航相关论文