铁路通信信号工程技术2016,Vol.13Issue(3):1-7,21,8.DOI:10.3969/j.issn.1673-4440.2016.03.001
郑州东枢纽RBC设置方案研究
摘要
Abstract
Setting reasonably RBC in Zhengzhou east junction can meet the demands of connecting with Zheng-Xu passenger dedicated line and reserving conditions for the connection of both Zheng-Wan and Zheng-Ji railway lines, which can avoid modiifcations to the RBC setting here in the following project. This paper studies the RBC setting in Zhengzhou east junction based on the existing situation of RBC setting and technical requirements.关键词
郑徐客专/RBC/枢纽/方案Key words
Zhengzhou-Xuzhou passenger dedicated line/Radio Block Center (RBC)/junction/solution引用本文复制引用
池春玲,谢静高..郑州东枢纽RBC设置方案研究[J].铁路通信信号工程技术,2016,13(3):1-7,21,8.基金项目
中国铁路总公司科技研究开发计划课题 ()