铁路通信信号工程技术2016,Vol.13Issue(3):33-36,58,5.DOI:10.3969/j.issn.1673-4440.2016.03.008
大型铁路枢纽GSM-R系统规划的探讨
摘要
Abstract
GSM-R system is crucial for ensuring the trains dispatching and operation safety. A large-scale railway junction station has complicated terrain and many lines constructed in different phases. So the GSM-R system for this kind of junction stations should be planed. The paper discusses the GSM-R network planning from the three aspects such as bearer services over the GSM-R system, BSC accessing plan, as well as the radio signals coverage, capacity and interference counteraction of the GSM-R network, and it also gives a simulated analysis of the key area in the junction stations through electric map and software combining with the actual conditions of Guiyang and Chengdu junction stations. It concludes that a well planned GSM-R system for the large-scale railway junction station can reduce the impact of following network construction on the existing network and ensure resources saving and train operation safety.关键词
GSM-R规划/同频干扰/GSM-R短号码Key words
GSM-R network planning/same frequency interference/GSM-R short number引用本文复制引用
吴浠桥,向志华,梁莹..大型铁路枢纽GSM-R系统规划的探讨[J].铁路通信信号工程技术,2016,13(3):33-36,58,5.基金项目
中国铁路总公司重大课题研究项目 ()