| 注册
首页|期刊导航|云南水力发电|滇中引水工程董家村渡槽跨河断面洪水分析

滇中引水工程董家村渡槽跨河断面洪水分析

杜俊 陈晶

云南水力发电2016,Vol.32Issue(3):1-3,3.
云南水力发电2016,Vol.32Issue(3):1-3,3.DOI:10.3969/j.issn.1006-3951.2016.03.001

滇中引水工程董家村渡槽跨河断面洪水分析

The Cross-section Flood Analysis of the Central Yunnan Dongjiacun Aqueduct across the River

杜俊 1陈晶1

作者信息

  • 1. 云南省水利水电勘测设计研究院,云南 昆明 650021
  • 折叠

摘要

Abstract

There are two cascade medium-sized water reservoirs called Pupeng and Shaojia respectively upstream of the Dali section II water conveyance line Dongjiacun aqueduct across a river of the water diversion works in central Yunnan province. According to the data now available 4 sub-regions with different lfood regimes were selected based on the same frequency along the river channel from upstream to downstream in order to reckon the design lfood at the cross-section of the Dongjiacun aqueduct across the river. As viewed from safety the design lfood at the cross-section of the Dongjiacun aqueduct across the river was considered optimal and selected after making comparison taking into consideration the worst inlfuence on the project.

关键词

滇中引水/董家村渡槽/洪水地区组成/逐级同频率法

Key words

water delivery in central Yunnan/Dongjiacun aqueduct/composition of lfood regions/cascaded same frequency method

分类

水利科学

引用本文复制引用

杜俊,陈晶..滇中引水工程董家村渡槽跨河断面洪水分析[J].云南水力发电,2016,32(3):1-3,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文