云南水力发电2016,Vol.32Issue(3):1-3,3.DOI:10.3969/j.issn.1006-3951.2016.03.001
滇中引水工程董家村渡槽跨河断面洪水分析
The Cross-section Flood Analysis of the Central Yunnan Dongjiacun Aqueduct across the River
杜俊 1陈晶1
作者信息
- 1. 云南省水利水电勘测设计研究院,云南 昆明 650021
- 折叠
摘要
Abstract
There are two cascade medium-sized water reservoirs called Pupeng and Shaojia respectively upstream of the Dali section II water conveyance line Dongjiacun aqueduct across a river of the water diversion works in central Yunnan province. According to the data now available 4 sub-regions with different lfood regimes were selected based on the same frequency along the river channel from upstream to downstream in order to reckon the design lfood at the cross-section of the Dongjiacun aqueduct across the river. As viewed from safety the design lfood at the cross-section of the Dongjiacun aqueduct across the river was considered optimal and selected after making comparison taking into consideration the worst inlfuence on the project.关键词
滇中引水/董家村渡槽/洪水地区组成/逐级同频率法Key words
water delivery in central Yunnan/Dongjiacun aqueduct/composition of lfood regions/cascaded same frequency method分类
水利科学引用本文复制引用
杜俊,陈晶..滇中引水工程董家村渡槽跨河断面洪水分析[J].云南水力发电,2016,32(3):1-3,3.