深基坑沉降与水平位移监测方案设计探讨

余凯

江西建材Issue(18):73-74,2.
江西建材Issue(18):73-74,2.

深基坑沉降与水平位移监测方案设计探讨

余凯1

作者信息

  • 1. 安徽工业经济职业技术学院,安徽 合肥 230051
  • 折叠

摘要

Abstract

In the process construction of the high -rise buildings pit,because of the excavation,load increase and the mechanical shock Etc,lead to the pit de-formation,even col apse.Based on the set lement and displacement monito-ring of the terminal ,we can master the regular pat ern of the terminal set le-ment and placement deformation along with the time .Thus provide the reli-able datas for construction and operation safety.This paper take the pit Set-tlement and placement observation for example,analysis the monitoring pro-gramme design,the observation points set ing ,the Set lement observation, the displacement observation and the data results submit ed.

关键词

深基坑/基准点/观测点/沉降观测/水平位移观测

Key words

Deep pit/The benchmark points/The observation points/The Set le-ment observation/The displacement observation

引用本文复制引用

余凯..深基坑沉降与水平位移监测方案设计探讨[J].江西建材,2016,(18):73-74,2.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文