露天采矿技术2016,Vol.31Issue(8):16-19,26,5.DOI:10.13235/j.cnki.ltcm.2016.08.005
征地制约影响下露天矿运煤系统方案研究
Study on coal transportation system scheme under the affect of land acquisition in open-pit mine
张亮 1马力 2钮景付 3杨洋 4高富强 1刘月亭1
作者信息
- 1. 神华准格尔能源有限责任公司 哈尔乌素露天煤矿,鄂尔多斯 010300
- 2. 中国矿业大学 矿业工程学院,徐州 221116
- 3. 中国矿业大学 矿业工程学院,徐州 221116
- 4. 中国矿业大学 深部岩土力学与地下工程国家重点实验室,徐州 221116
- 折叠
摘要
Abstract
According to stope coal transportation system layout difficulty, coal mining operation face delay, internal dumping tension situation in Haerwusu Open-pit Coal Mine, the article presents coal transportation system change into internal dump, and analyzes shift scheme of internal dump coal transportation system. The author presents the raw coal transportation system shift scheme under the affect of land acquisition, which temporarily alleviates the difficult situation of production under the pit.关键词
露天矿/移设方案/运煤系统/运距/压脚Key words
open-pit mine/shift scheme/coal transportation system/transportation distance/pressure foot分类
矿业与冶金引用本文复制引用
张亮,马力,钮景付,杨洋,高富强,刘月亭..征地制约影响下露天矿运煤系统方案研究[J].露天采矿技术,2016,31(8):16-19,26,5.