水文地质工程地质2016,Vol.43Issue(3):17-21,5.DOI:10.16030/j.cnki.issn.1000-3665.2016.03.04
邢台百泉泉域岩溶地下水模拟与方案调算
Simulation and scheme calculation of groundwater in the Baiquan karst groundwater system near Xingtai
摘要
Abstract
The south-to-north water diversion middle route project will greatly ease the contradiction of water supply and demand in Xingtai.Reasonable reduction in exploitation and recharge of the karst groundwater can raise the groundwater levels and even lead to the re-upwelling of the Baiquan spring.In this paper,a numerical model of the karst groundwater was built for the catchment area of the Baiquan spring Near Xingtai.The model was used to quantitatively evaluate the implementation effect of various technical solutions by simulating different schemes of water transfer,including reduction in exploitation and recharge.The feasibility of re-issuing of the spring is proved,which provides a scientific basis for the scientific development objectives and measures for the Baiquan spring.关键词
岩溶/地下水/邢台/百泉/回灌Key words
karst/groundwater/Xingtai/Baiquan/artificial recharge分类
地质学引用本文复制引用
柴福鑫,潘世兵,石维新,李琳..邢台百泉泉域岩溶地下水模拟与方案调算[J].水文地质工程地质,2016,43(3):17-21,5.基金项目
水体污染控制与治理科技重大专项(2012ZX07201) (2012ZX07201)
北京市科技计划课题(Z121100000312036) (Z121100000312036)