中国资源综合利用2016,Vol.34Issue(6):59-61,3.
高寒地区湿法炼铜技术特点分析
Technical Characteristics of Copper Hydrometallurgy Project in High Cold Region of Kazakhstan
张磊 1魏帮 2黄胜 1蒋应平 1周志强1
作者信息
- 1. 北京矿冶研究总院,北京 100160
- 2. 东北大学 冶金学院,沈阳 110819
- 折叠
摘要
Abstract
The article introduces the hydrometallurgical process with Leaching-Solvent Extraction-Electro winning to recovery copper from low grade waste ore by the sample of Kounrad copper project. The design character of Kounrad project is described. This plat was normal running more than 4 years, which the purity of cathode copper was beyond 99.99%. The operating cost was below USD 2,000/tCu. This plant is annual running with the high cold temperature.关键词
冶金技术/铜/高寒地区/堆浸-萃取-电积Key words
hydrometallurgy/copper/high cold region/leaching-solvent extraction-electro winning分类
矿业与冶金引用本文复制引用
张磊,魏帮,黄胜,蒋应平,周志强..高寒地区湿法炼铜技术特点分析[J].中国资源综合利用,2016,34(6):59-61,3.