| 注册
首页|期刊导航|电力系统自动化|基于时间延迟理论的海上风电机组不定期检修策略

基于时间延迟理论的海上风电机组不定期检修策略

符杨 李学武 黄玲玲

电力系统自动化2016,Vol.40Issue(15):133-140,8.
电力系统自动化2016,Vol.40Issue(15):133-140,8.DOI:10.7500/AEPS20151108007

基于时间延迟理论的海上风电机组不定期检修策略

Irregular Maintenance Strategy for Offshore Wind Turbines Based on Time-delay Theory

符杨 1李学武 1黄玲玲1

作者信息

  • 1. 上海电力学院电气工程学院,上海市 200090
  • 折叠

摘要

Abstract

Due to the special operating environment for offshore wind turbines , it is often to replace parts as a whole when a failure occurs . Implementing condition‐based maintenance and selecting suitable replacement cycles is an effective strategy for reducing operational costs . But the condition monitoring and health diagnosis technology overseas are not reliable . Aiming at the problem , based on operation and maintenance logs , and the time interval between potential fault and functional fault , the time‐delay theory is introduced into the offshore wind turbine maintenance , and the law of development from potential failure to functional failure is modeled . Based on this , an irregular preventive maintenance strategy is proposed , and the parts replacement cycle is optimized . Case analysis shows that the proposed method can determine a set of optimal operational strategies , maintain the parts unit cost expectation at a low level . In the meantime , the results of sensitivity analysis can be used to make operation risk assessment for the optimized strategy .

关键词

海上风电机组/运维日志/时间延迟/不定期检修/更换周期

Key words

offshore wind turbine/log of operation and maintenance/time delay/irregular maintenance/replacement cycle

引用本文复制引用

符杨,李学武,黄玲玲..基于时间延迟理论的海上风电机组不定期检修策略[J].电力系统自动化,2016,40(15):133-140,8.

基金项目

上海市科委科技创新项目(14DZ1200905)。This work is supported by Science and Technology Innovation Project of Shanghai Science and Technology Commission ( No .14DZ1200905). ()

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文