华南地震2016,Vol.36Issue(2):60-69,10.DOI:10.13512/j.hndz.2016.02.010
山西运城东郭井水位异常变化成因研究
Study on Cause of Anomaly Change of Water Level at Dongguo Well in Yuncheng, Shanxi
摘要
Abstract
Anomaly verification is the basis of seismic analysis and prediction. Water level of Dongguo well appears accelerating drop on August 2nd, 2012. According to the working plan of anomaly verification, the author does the investigation from the system of observation technology, variation of produced quantity of underground water around the wellhole, variation of water consumption of irrigation of farmland, meteorological factor, and observation and contrast test of the corresponding period. Through the investigation and analysis, it is considered that the variation is related to tectonic activity and the work has some reference value to judging and checking of anomaly.关键词
东郭井水位/水位变化/对比试验/干扰因素Key words
Water level of Dongguo well/Variation of water level/Contrast test/Inference factor分类
天文与地球科学引用本文复制引用
范雪芳,刘国俊,王霞,闫亚荣,梁建华..山西运城东郭井水位异常变化成因研究[J].华南地震,2016,36(2):60-69,10.基金项目
地震行业科研专项“汾渭断陷带中段地震危险性研究”(2014419013)和震情跟踪任务“晋冀蒙交界地区观测与研究”共同资助。 (2014419013)