新沟河延伸拓浚工程江边枢纽船闸闸室施工控制

Construction control of riverside hub lock chamber in Xingouhe extension and dredging project

崔彩 1杨锋鸽2

作者信息

  • 1. 中亿丰建设集团股份有限公司,江苏苏州 215000
  • 2. 上海宏波工程咨询管理有限公司,上海 200000
  • 折叠

摘要

Abstract

The characteristics and difficulties of riverside hub lock chamber in Xingouhe extension and dredging project are analyzed. The lock floor and pier wall is large volume concrete,single section concrete pouring quantity is large,quality requirements are high. For solving the common defects of cracks in concrete construction and appearance quality of lock chamber,according to the construction process,the construction program is optimized. Aspects as follow:fabrication and installation of steel and formwork,concrete mix ratio,pouring layer,temperature control,vibration,conservation,backfill behind the wall,other details and quality assessment of the project are explored. The corresponding technical measures are proposed.

关键词

闸室/施工/温度控制/混凝土配合比

Key words

lock chamber/construction/temperature control/concrete mixture ratio

分类

建筑与水利

引用本文复制引用

崔彩,杨锋鸽..新沟河延伸拓浚工程江边枢纽船闸闸室施工控制[J].江苏水利,2016,(8):20-23,4.