| 注册
首页|期刊导航|采矿与安全工程学报|沙吉海煤矿弱胶结膨胀性软岩巷道大变形控制对策

沙吉海煤矿弱胶结膨胀性软岩巷道大变形控制对策

郝育喜 王炯 袁越 王晓雷 朱国龙 何满潮

采矿与安全工程学报2016,Vol.33Issue(4):684-691,8.
采矿与安全工程学报2016,Vol.33Issue(4):684-691,8.DOI:10.13545/j.cnki.jmse.2016.04.018

沙吉海煤矿弱胶结膨胀性软岩巷道大变形控制对策

Large deformation control technology for expansive and weak-cemented soft rock roadways in Shajihai coal mine

郝育喜 1王炯 1袁越 2王晓雷 3朱国龙 1何满潮1

作者信息

  • 1. 中国矿业大学 北京 力学与建筑工程学院,深部岩土力学与地下工程国家重点实验室,北京 100083
  • 2. 湖南科技大学能源与安全工程学院,湖南湘潭 411201
  • 3. 华北理工大学矿业工程学院,河北唐山 063009
  • 折叠

摘要

Abstract

The roadways excavated in expansive and weak-cemented soft rocks in Shajihai coal mine have caused serious large deformation problems such as roof failing, side collapse and floor heave in the field. In this paper the X-ray diffraction, SEM scanning, mechanical tests and water absorption tests have been performed to study the characteristics of this soft rock and mechanism of deformation and failure of roadway based on the actual site situation. Research on deformation mechanisms have shown that the main reasons for roadway failure is that the surrounding rocks are with features of weak-cemented and strong swelling ability. When exposed to severe excavation disturbance and low strength support, the surrounding rock cannot match the deformation of the support system by tradi-tional anchor-bolt-mesh support, and the capacity of surrounding rock is wasted in roadway supporting system. Based on the above, the support capacity of surrounding rock has been employed for energy absorbing and ground pressure decreasing, and water isolation for reinforcement has also been per-formed. Based on the theory of absorbing energy support using Constant Resistance and Large Defor-mation (CRLD) bolts and anchors, a new support scheme has been put forward, which is the CRLD bolt + mesh + sprayed concrete layer + CRLD anchor + bottom anchor pipe. Field monitoring results have shown that the large deformation of weak-cemented soft rock has been better controlled than before by the application of new support scheme.

关键词

弱胶结软岩/膨胀性/恒阻大变形锚杆/大变形控制/数值分析

Key words

weak-cemented soft rock/expansive characteristic/constant resistance and large defor-mation bolts/large deformation control/numerical analysis

分类

矿业与冶金

引用本文复制引用

郝育喜,王炯,袁越,王晓雷,朱国龙,何满潮..沙吉海煤矿弱胶结膨胀性软岩巷道大变形控制对策[J].采矿与安全工程学报,2016,33(4):684-691,8.

基金项目

国家自然科学基金项目(51374214);国家自然科学基金青年科学基金项目(51404278) (51374214)