Abstract

In the process of driving of Jurassic thick coal seam, Expected the meeting of the continuous fault fracture zone, the pneumatic coal drill and rock drilling ,artiifcial loading blasting construction method were used in roadway excavation, roadway was drived along the roof of coal seam, taking suspension theory , the pipe-shed method was used to support . The practical construction proved that the method has obvious effect, and the formation of the roadway becomes better, which can effectively maintain the roof and two sides of the roadway.

关键词

连续断层/爆破/穿钢针/维护顶板

Key words

continuous faults/blasting/steel pipe/roof maintenance