基于CPM的铁塔公司4G基站项目验收管理方法研究

郭玮 钟志成

移动通信2016,Vol.40Issue(15):87-90,96,5.
移动通信2016,Vol.40Issue(15):87-90,96,5.DOI:10.3969/j.issn.1006-1010.2016.15.017

基于CPM的铁塔公司4G基站项目验收管理方法研究

Research on 4G Base Station Project Acceptance Management Method of China Tower Company Based on CPM

郭玮 1钟志成2

作者信息

  • 1. 中国铁塔股份有限公司广东省分公司,广东 广州 510000
  • 2. 中睿通信规划设计有限公司,广东 广州 510000
  • 折叠

摘要

Abstract

In order to effectively optimize the China Tower company’s 4G station project approval process, improve efficiency, the existing management problems were first analyzed, and the paper pointed out the challenges faced by the traditional mode. Then it put forward a management method based on CPM, and designed and developed the 4G base station acceptance CPM management program. At last, the application of CPM management program in 4G base station acceptance verified the scientific and applicability of the method and the program, thus effectively reduced the time and resources of 4G base station project acceptance.

关键词

CPM/4G基站/验收管理

Key words

CPM/4G base station/acceptance management