| 注册
首页|期刊导航|广东水利水电|某心墙堆石坝沉降分析

某心墙堆石坝沉降分析

蒲英 陈科文 周郭 李明霞 李强

广东水利水电Issue(4):33-36,4.
广东水利水电Issue(4):33-36,4.

某心墙堆石坝沉降分析

Settlement Analysis of a Core Wall Rockfill Dam

蒲英 1陈科文 2周郭 1李明霞 2李强3

作者信息

  • 1. 四川省南充市城乡供排水管理服务处,四川南充 637000
  • 2. 四川省南充市水务局,四川南充 637000
  • 3. 四川省南充升钟水利工程建设管理局,四川西充 637200
  • 折叠

摘要

Abstract

Combined with the actual situation of a core rockfill dam, monitoring data of the settlement pipe and water pipe type are collected during construction period.The settlement of the law and the uneven settlement of the dam is analyzed.The results show:At the time of completion, the maximum settlement of the dam body is not occurred at the top of the dam, but occurs at middle ele-vation of dam body.The settlement of each measuring point has a good correlation with the filling progress in time, the difference of compressive modulus is the key influencing factor of the uneven settlement gradient, and the corresponding measures should be taken to prevent the uneven settlement during the construction period.

关键词

心墙堆石坝/沉降/压缩模量/沉降梯度

Key words

core wall rockfill dam/settlement/compression modulus/settlement gradient

分类

建筑与水利

引用本文复制引用

蒲英,陈科文,周郭,李明霞,李强..某心墙堆石坝沉降分析[J].广东水利水电,2016,(4):33-36,4.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文