| 注册
首页|期刊导航|实验流体力学|3m×2m结冰风洞总压探针和皮托管研制

3m×2m结冰风洞总压探针和皮托管研制

祖孝勇 张林 肖斌 朱世民

实验流体力学2016,Vol.30Issue(4):76-80,5.
实验流体力学2016,Vol.30Issue(4):76-80,5.DOI:10.11729/syltlx20160006

3m×2m结冰风洞总压探针和皮托管研制

Study and development of total pressure probe and pitot tube in 3m×2m icing wind tunnel

祖孝勇 1张林 1肖斌 1朱世民2

作者信息

  • 1. 中国空气动力研究与发展中心,四川 绵阳 621000
  • 2. 成都凯天电子股份有限公司,成都 610091
  • 折叠

摘要

Abstract

The total pressure probe and the pitot tube with the anti-icing/deicing functions are important measurement equipment in icing wind tunnels for which the aerodynamic design is crit-ical.Taking a cue from some airspeed head’s manufacture,the total pressure probe and the pitot tube are designed,by using new techniques and deploying the proper heated cable distribution. They show reasonable results in the ground-based static testing,calibration and experiment in the icing wind tunnel with high reliability and insulating property according to China national military standard.

关键词

结冰风洞/防除冰/总压探针/皮托管/可靠性/绝缘性

Key words

icing wind tunnel/anti-icing/deicing system/total pressure probe/pitot tube/relia-bility/insulating property

分类

航空航天

引用本文复制引用

祖孝勇,张林,肖斌,朱世民..3m×2m结冰风洞总压探针和皮托管研制[J].实验流体力学,2016,30(4):76-80,5.

实验流体力学

OA北大核心CSCDCSTPCD

1672-9897

访问量0
|
下载量0
段落导航相关论文