南方电网技术2016,Vol.10Issue(7):1-5,12,6.DOI:10.13648/j.cnki.issn1674-0629.2016.07.001
云南电网与南方电网主网异步联网系统试验分析
Experiment and Analysis on Asynchronously Interconnected System of Yunnan Power Grid and Main Grid of China Southern Power Grid
付超 1柳勇军 1涂亮 1李鹏 1洪潮 1吴琛 2徐敏 1赵睿1
作者信息
- 1. 南方电网科学研究院,广州510080
- 2. 云南电力调度控制中心,昆明650041
- 折叠
摘要
Abstract
After the asynchronous interconnection of Yunnan Power Grid (YPG)and the main grid of China Southern Power Grid (CSG),the system stability characteristics of YPG will change dramatically,and the problem of system frequency will become the main stability problem. In order to ensure the operation security of YPG after asynchronous interconnection,a series of experiments on the asynchronous interconnected system is carried out by CSG to validate the frequency control measures including the primary frequen-cy regulation,the frequency limit controller (FLC)of HVDC,the electric power system stability control system,and the third line of defence. The experiment items from April 7 to April 9 are introduced in this paper. The main problems and cases occurred in the sys-tem experiment are analyzed,and simulation and comparison are carried out. The results show that the FLC of HVDC and the electric power system stability control system are able to adapt to the operating requirements of YPG after asynchronous interconnection,while the PID parameters of hydro trubine governors and the dead-zone settings of primary frequency regulation still need to be further opti-mized and regulated.关键词
异步联网/系统试验/试验现象/频率控制/仿真分析Key words
asynchronous interconnection/system experiment/experiment appearance/frequency control/simulation analysis分类
信息技术与安全科学引用本文复制引用
付超,柳勇军,涂亮,李鹏,洪潮,吴琛,徐敏,赵睿..云南电网与南方电网主网异步联网系统试验分析[J].南方电网技术,2016,10(7):1-5,12,6.