南方电网技术2016,Vol.10Issue(7):24-28,5.DOI:10.13648/j.cnki.issn1674-0629.2016.07.005
云南电网与南方电网主网异步联网实施阶段的系统风险分析
System Risk Analysis on Implementation Stage of Asynchronous Interconnection of Yunnan Power Grid and Main Grid of CSG
付超 1张丹 2柳勇军 1洪潮 1涂亮 1徐敏 1吴琛2
作者信息
- 1. 南方电网科学研究院,广州510080
- 2. 云南电力调度控制中心,昆明650041
- 折叠
摘要
Abstract
During the implementation of the asynchronous interconnection of Yunnan Power Grid and the main grid of China Southern Power Grid (CSG),the system stability characteristics will change dramatically. In the implementation periods,power transmission section of Yunnan needs to be disconnected with different 500 kV AC tie lines,moreover,since the times of Luxi Back-to-back HVDC and Yongfu HVDC project being put into operation are uncertain,different asynchronous interconnection interim schemes have influ-ence on the security and stability of the power system. In order to reduce the risk of system operation ,this paper proposes interim op-eration modes for the implementation stage of the asynchronous interconnection projects and analyzes the corrsponding stability charac-teristics,with a focus on electric power system stability control system adaptability,configuration of the third line of defence,and en-gineering commissioning of Luxi Back-to-back HVDC and Yongfu HVDC projects,etc,effective suggestions are provided to improve the security and stability level of the power system.关键词
异步联网/过渡方案/稳定特性/安全措施Key words
asynchronous interconnection/interim scheme/stability characteristics/safety precautions分类
信息技术与安全科学引用本文复制引用
付超,张丹,柳勇军,洪潮,涂亮,徐敏,吴琛..云南电网与南方电网主网异步联网实施阶段的系统风险分析[J].南方电网技术,2016,10(7):24-28,5.