基于 BIM 的地铁施工过程集成管理
BIM-based Integrated Management for Metro Construction Process
摘要
Abstract
Metro construction process is a complicated process , involving multi-dimensional information likeschedule、cost、quality and safety . In the traditional management mode , multi-dimensional information is hard to achieve accurately and efficiently to transfer and integrat manage .Aiming at the challenge of Metro construction in traditional management methods , this paper proposes a solution of BIM-based integrated management for Metro construction process .First of all, based on 3D BIM model of metro , we discuss how to integrate different information about schedule、cost、quality or safety in the same 3 D model; and then how to develop the integrated management system based on the integrated model;Finally, taking ZhongNan Station in Wuhan Metro Line 2 as an example, this paper introduces details of hardware configuration and function modules of the integrated system , shows the usage and implementation effect of this system , which deeply reflects wide application value and development prospect of BIM-based integrated management for metro construction process .关键词
地铁/施工管理/BIM/集成管理Key words
metro/construction management/BIM/integrated management分类
建筑与水利引用本文复制引用
周少东,饶阳,周迎,徐海清..基于 BIM 的地铁施工过程集成管理[J].土木工程与管理学报,2016,33(4):1-7,28,8.基金项目
国家自然科学基金 ()