基于 BIM 的地铁施工过程集成管理

周少东 饶阳 周迎 徐海清

土木工程与管理学报2016,Vol.33Issue(4):1-7,28,8.
土木工程与管理学报2016,Vol.33Issue(4):1-7,28,8.

基于 BIM 的地铁施工过程集成管理

BIM-based Integrated Management for Metro Construction Process

周少东 1饶阳 2周迎 2徐海清1

作者信息

  • 1. 武汉地铁集团有限公司,湖北 武汉 430030
  • 2. 华中科技大学 土木工程与力学学院,湖北 武汉 430074
  • 折叠

摘要

Abstract

Metro construction process is a complicated process , involving multi-dimensional information likeschedule、cost、quality and safety . In the traditional management mode , multi-dimensional information is hard to achieve accurately and efficiently to transfer and integrat manage .Aiming at the challenge of Metro construction in traditional management methods , this paper proposes a solution of BIM-based integrated management for Metro construction process .First of all, based on 3D BIM model of metro , we discuss how to integrate different information about schedule、cost、quality or safety in the same 3 D model; and then how to develop the integrated management system based on the integrated model;Finally, taking ZhongNan Station in Wuhan Metro Line 2 as an example, this paper introduces details of hardware configuration and function modules of the integrated system , shows the usage and implementation effect of this system , which deeply reflects wide application value and development prospect of BIM-based integrated management for metro construction process .

关键词

地铁/施工管理/BIM/集成管理

Key words

metro/construction management/BIM/integrated management