基于时间参数表的 RSM 图绘制方法

蒋红妍 王鑫业 徐锐

土木工程与管理学报2016,Vol.33Issue(4):18-23,6.
土木工程与管理学报2016,Vol.33Issue(4):18-23,6.

基于时间参数表的 RSM 图绘制方法

Approach of RSM Diagram Drawing Based on Time Parameter Table

蒋红妍 1王鑫业 1徐锐1

作者信息

  • 1. 西安建筑科技大学 土木工程学院,陕西 西安 710055
  • 折叠

摘要

Abstract

RSM diagram is the foundation of scheduling control and optimization in repetitive construction project , yet the existing methods are still not good enough . The optimal resource utilization option of each activity group is identified to obtain the duration of each activity and assure consistency between RSM diagram and practical construction situation .Time parameter table , which includes the information of duration , start and finish time, interruption time, is established.Then, RSM diagram can be abtained quickly and accurately by simply calculating on time parameter table and shifting initial production line .The obtained RSM diagram has satisfy precedence and overlapping relationships , resource availability constraints . To provide sufficient information for project management, controlling array is defined to specify the controlling sequence and types of activities through operation on time parameter table .An example application is presented to illustrate the specific steps of drawing RSM diagram based on time parameter table .

关键词

RSM图/时间参数表/控制数组/控制序列

Key words

RSM diagram/time parameter table/controlling array/controlling sequence

分类

通用工业技术

引用本文复制引用

蒋红妍,王鑫业,徐锐..基于时间参数表的 RSM 图绘制方法[J].土木工程与管理学报,2016,33(4):18-23,6.

基金项目

国家自然科学基金(51408459);陕西省自然科学基金 ()