| 注册
首页|期刊导航|冶金动力|外旋式旋流沉淀池与冲渣沟接头部位施工概述

外旋式旋流沉淀池与冲渣沟接头部位施工概述

穆红卫

冶金动力Issue(9):45-47,3.
冶金动力Issue(9):45-47,3.

外旋式旋流沉淀池与冲渣沟接头部位施工概述

Construction of the Connection Part between External Rotary Whirl Sedimentation Tank and Slag Sluice

穆红卫1

作者信息

  • 1. 马钢利民建安公司,安徽马鞍山 243000
  • 折叠

摘要

Abstract

The whirl sedimentation tank in the water treatment system of a 1580 mm hot rolling project adopted external rotary process, with the water for the main rolling line flowing into the sedimentation tank through slag sluice. A ψ2420mm ×30mm steel pipe was pre-buried at the connecting location between slag sluice and whirl sedimentation tank, ex-tending into the tank and intersecting with the outer wall of the tank. Treatment of the con-necting position between slag sluice and whirl sedimentation tank became a difficult point to tackle. The treatment method and corresponding control process are introduced.

关键词

旋流沉淀池/外旋式/冲渣沟/防水套管

Key words

whirl sedimentation tank/external rotary/slag sluice/waterproof sleeve

分类

建筑与水利

引用本文复制引用

穆红卫..外旋式旋流沉淀池与冲渣沟接头部位施工概述[J].冶金动力,2016,(9):45-47,3.

冶金动力

1006-6764

访问量0
|
下载量0
段落导航相关论文